MILITARY
Click on a picture to start the slideshow
How the Power Dozer works Slide 1 of 27
Material Flow of the Side-Casting Power Dozer Slide 2 of 27
Material flows upward during berm construction Slide 3 of 27
Completed Berm Slide 4 of 27
Urban Operations Live Fire Lane Enhancements Slide 5 of 27
Live Fire Lane Enhancements Construction Slide 6 of 27
The clean Power Dozer cut makes a deeper, defined trench that would create conditions to make an enemy breach difficult. Construction time: 1 hour Slide 7 of 27
Canals are in close proximity. The Power Dozer can work in close quarters which is an advantage over conventional dozers. This is also a tank obstacle. Slide 8 of 27
Forward Operating Base (FOB) Construction Slide 9 of 27
Forward Operating Base (FOB) Completed Construction Slide 10 of 27
Breaching and Clearing Mission Slide 11 of 27
Breaching and Clearing Site Slide 12 of 27
Breaching and Clearing | Extreme hard pack Slide 13 of 27
Breaching and Clearing | Extreme hard pack Slide 14 of 27
Breaching and Clearing | Extreme hard pack Slide 15 of 27
Breaching and Clearing | Extreme hard pack Slide 16 of 27
Breaching and Clearing | Extreme hard pack Slide 17 of 27
Breaching and Clearing | Extreme hard pack Slide 18 of 27
Extreme hardpack 100% cleared Slide 19 of 27
Beach Breaching and Clearing Site | Beach Slide 20 of 27
Breaching and Clearing | Sand Slide 21 of 27
Breaching and Clearing | Sand Slide 22 of 27
Breaching and Clearing | Sand Slide 23 of 27
Breaching and Clearing | Sand Slide 24 of 27
Breaching and Clearing | Sand Slide 25 of 27
Beach 100% Cleared Slide 26 of 27
Beach 100% Cleared Slide 27 of 27